Plot annual and monthly missing dates
Plots the number of missing data for each month of each year. Calculates statistics from all values, unless specified.
Data calculated using screen_flow_data()
function. Returns a list of plots.
plot_missing_dates( data, dates = Date, values = Value, groups = STATION_NUMBER, station_number, roll_days = 1, roll_align = "right", water_year_start = 1, start_year, end_year, months = 1:12, include_title = FALSE )
data |
Data frame of daily data that contains columns of dates, flow values, and (optional) groups (e.g. station numbers).
Leave blank if using |
dates |
Name of column in |
values |
Name of column in |
groups |
Name of column in |
station_number |
Character string vector of seven digit Water Survey of Canada station numbers (e.g. |
roll_days |
Numeric value of the number of days to apply a rolling mean. Default |
roll_align |
Character string identifying the direction of the rolling mean from the specified date, either by the first
( |
water_year_start |
Numeric value indicating the month ( |
start_year |
Numeric value of the first year to consider for analysis. Leave blank to use the first year of the source data. |
end_year |
Numeric value of the last year to consider for analysis. Leave blank to use the last year of the source data. |
months |
Numeric vector of months to include in analysis (e.g. |
include_title |
Logical value to indicate adding the group/station number to the plot, if provided. Default |
A list of ggplot2 objects with the following for each station provided:
Missing_Dates |
a plot that contains the number of missing dates for each year and month |
# Run if HYDAT database has been downloaded (using tidyhydat::download_hydat()) if (file.exists(tidyhydat::hy_downloaded_db())) { # Plot missing dates using a data frame and data argument with defaults flow_data <- tidyhydat::hy_daily_flows(station_number = "08NM116") plot_missing_dates(data = flow_data) # Plot missing dates using station_number argument with defaults plot_missing_dates(station_number = "08NM116") # Plot missing dates for water years starting in October plot_missing_dates(station_number = "08NM116", water_year_start = 9) # Plot missing dates for 7-day flows for July-September months only plot_missing_dates(station_number = "08NM116", roll_days = 7, months = 7:9) }
Please choose more modern alternatives, such as Google Chrome or Mozilla Firefox.